This week our major masonry projects are just about finished up. The most striking of these are the textured block columns that surround the doorway, which wrap the steel posts with a defiant "come at me bro" air of impenetrability. These columns will allow us to install a door (startled gasp) sometime next week, which should prove to be a great boon to the shop's business success.
The windows have been framed, and we hope to have glass coming in shortly. If cartoons have taught us anything, this means we'll have to keep a stern eye out for baseball-playing youths on nearly every future sunny day.
Just in time for the region's first wave of pleasant autumnal weather, our HVAC system is being installed! The spiral ductwork will be exposed; it is metal and therefore looks rad.